Everything You Need To Know About The Virar-Alibaug Multi-Modal Corridor

Introduction Virar-Alibaug Multi-Modal Corridor

Virar-Alibaug Multi-Modal Corridor Within the 126-kilometre Virar-Alibaug-Multi-Modal Corridor, the Maharastra State Road Development Corporation has asked for bids from construction companies to develop a segment totaling 96.41 km. The goal of this corridor is to link Balavali in Raigad with Navghar on the Mumbai-Ahmedabad Highway in Thane. It will incorporate both a highway and a metro network. It will pass through the districts of Palghar, Thane, and Raigad.

 


Are you looking for rental flats in Thakurli ?


Finance & Cost

Based on the current plan, the Maharastra State Road Development Corporation (MSRDC) hopes to complete this challenging project in three years or less. To secure money for the infrastructure, the Maharashtra government is in contact with the Asian Development Bank (ADB) and the Japan International Cooperation Agency (JICA).

The corridor is slat to become operational in two phases, according to the Mumbai Metropolitan Region Development Authority (MMRDA). The first phase will cover 79 km, from Navghar to Chirner, in close proximity to the JNPT. The initial phase is anticipate to cost Rs 10,000 crore. The second section, which runs from Chirner to Alibaug, will be around 47 kilometres long.

 

The Impact Of The Virar Alibaug Corridor On MMR

The following are some crucial details about the same:

  • The project ensures improved connections between the city and important national highways, including the Mumbai-Pune Motorway, NH4B (JNPT), NH4 (Pune-Bangalore), and NH8 (Delhi-Mumbai). As a result, travellers on these important transport corridors will have quicker and more accessible access to the city.

 

  • The programme would enhance connectivity with significant on-going projects, including the Dedicated Freight Corridor, Revas Port, Mumbai Trans Harbour Link, and Navi Mumbai International Airport. Better connections and accessibility between these big developments and the neighbourhood will result from this.

 

  • A number of growth center will be built within the corridor, converting Virar, Bhiwandi, Kalyan, Dombivali, Panvel, Taloja, and Uran into satellite cities.

 

  • Strategic planning and infrastructure upgrades will be part of this development, promoting the growth and urbanisation of these areas.

 

  • The time it take to get from Virar to Alibaug will be cut in half once the road is finish.

 

  • The building of a megacity within the Navi Mumbai Airport Influence Notified Area will be greatly aid by the road. It will offer crucial accessibility and connectivity, assisting in the township’s development. The road’s construction will improve transport alternatives and promote the region’s general growth and prosperity.

 

Estimate Project’s Cost

The current project cost estimate is Rs. 55,564 crore.

Virar-Alibaug Multi-Modal Corridor

Conclusion

To build a 96.41-kilometre section of the Virar-Alibaug-Multi-Modal Corridor, the Maharastra State Road Development Corporation has issued a request for proposals. Through the districts of Palghar, Thane, and Raigad, this corridor would connect the cities of Navghar and Balavali. It will facilitate new developments, create growth centres, cut down on travel time, encourage the growth of a mega township, and promote regional wealth. It would also improve connectivity with national highways. The project will cost approximately Rs. 55,564 crore.

 

 

 


Navi Mumbai Houses a Real Estate source is the most trusted names in the market believes that master pieces can only be achieve by the client’s satisfaction. So that you can give your quality time with your loved ones is actually worth enough. Do you want Sale house Flats in thane our portal is help you to find a buy flat to your price so please visit n find.

 

 

Disclaimer: The views of this expressed above are for informational purposes only based on the industry reports & related news stories. Navimumbaihouses.com does not guarantee the accuracy of this article, completeness, or reliability of the information & shall not be held responsible for any action taken based on the published information.
Back to top
Also Read

Related Posts

Buy Properties in Shilphata