
Mumbai Metro Gold Line To Airport Route Map For Line 8 Of The Mumbai Metro
Line 8 of the Mumbai metro will also be referred to as the Gold Line. The proposed Navi Mumbai International Airport (NMIA) and Chhatrapati Shivaji International Airport (CSIA) will be connected by the metro line. Compared to the other planned lines in the network, metro line 8 will be an outlier on the route chart for the Mumbai metro.
Are you searching for new projects in Santacruz?
Regarding Mumbai 8th Metro Line
The Santacruz airport in Mumbai and the projected Navi Mumbai airport would be better connected thanks to the Mumbai metro line 8. An estimated 40 kilometres will be covered by the metro line. On the line, there will be about seven metro stations to ensure faster connectivity.
The NMIA is expected to begin operations in early 2024 or 2024. As a result, it’s possible that line 8 of the Mumbai metro may be ready around that time. The DPR finalization is now underway. With several stops and fast speed, the Gold line to the airport will resemble the Delhi Airport metro line in certain ways. The airport line will run less frequently than the ordinary metro. This line will run approximately every 15 minutes.
The Gold Line’s metro will move at a quicker pace than the others. For the airport corridor, the metro’s fixed speed is roughly 90 km/h. The Mumbai metro line 8 route plan would have fewer stations to ensure speedier and high-speed transit. Around 5 Lakh people are anticipated to use the Mumbai metro’s Gold line or airport line each day. It is expected that the Gold line to the airport will cost roughly Rs. 15000 crores to complete.
Map of the Mumbai Metro Line 8
The following is a map of the Mumbai metro line 8 route:
An overview of Mumbai Metro Line 8
Here are some important details about the Mumbai metro’s Gold line:
Fact | Details |
Length of the line 8 | Approximately 35 to 40 km |
Number of stations | 8 (proposed) |
Type of metro i.e. underground or elevated | Partially underground and partially elevated |
Estimated ridership | 9 Lakhs daily |
Owner of the Mumbai metro line 8 | Mumbai Metropolitan Region Development Authority (MMRDA) |
Speed | 90 km/hr |
Estimated cost | Rs 15,000 Crores |
Building Plan for Line 8 of the Mumbai Metro
Mumbai Metropolitan Region Development Authority (MMRDA) & City & Industrial Development Corporation (CIDCO) will work together to create the metro line. The building of the metro line in the Mumbai region will be handled by MMRDA, while CIDCO will handle the work in the Navi Mumbai area.
The Gold Line will be partially elevated and partially underground, according to the planned plan. From Andheri to Ghatkopar, specifically close to the Eastern Motorway route, will have an underground stretch. It will be an elevated corridor, or the Gharkopar to Mankhurd Link Road, from Ghatkopar to Mankhurd.
The line 8 of the Mumbai Metro contains a full project report that was created by CIDCO. The MMRDA asked CIDCO to prepare it by October 2022. The Metro line 1A in Navi Mumbai, which runs from Mankhurd to Sagar Sangam, and the section from Belapur to Navi Mumbai are covered by the DPR for Mumbai Airport Line route chart.
Major Cities Near the Mumbai Metro Line 8
The development of Mumbai Metro Line 8 would have the greatest impact on the main communities of Vashi, Gharkopar, Cheddha Nagar Jn, & Mankhurd Link Road, among others.
Locality | Features |
Vashi | Completely built-out residential and business neighbourhood with top-notch infrastructure. |
Residential Property Prices Per Sq Ft | |
Buy: Rs 11,500- Rs 20,500 | |
Rent: Rs 27- Rs 43 | |
Commercial Hubs Near Vashi | |
International Infotech Park | |
The Corporate Park | |
Satra Plaza | |
Maha Mumbai Reality | |
Intelligentia Business Park Vashi By Haware Properties | |
G-Square Business Park | |
Educational Institutes Nearby | |
Father Agnel Multipurpose School & Junior College | |
St. Lawrence High School | |
Avalon Heights International School | |
Anchorwala Education Academy | |
I E S Navi Mumbai High School | |
Goldcrest High School | |
Ghatkopar | A centrally located residential suburb in Eastern Mumbai with excellent connectivity |
Residential Property Prices Per Sq Ft | |
Buy Rs 11,100 – Rs19,400 | |
Rent Rs 32 – RS 53 | |
Entertainment Hubs Near Ghatkopar | |
R City | |
R Odeon | |
Phoenix Marketcity Mall | |
Educational Institutes Nearby | |
KJ Somaiya College of Engineering | |
Somaiya Vidyaviha | |
Garodia International Centre For Learning |
Conclusion the Mumbai Metro Line 8
In order to sum up, the metro line 8 was projected in 2022. MMRDA instructed CIDCO to develop the DPR for the Mumbai metro line 8 route map & construction work in October 2022. The line, which would connect the two international airports in Mumbai & the Navi Mumbai region, will be an outlier. MMRDA and CIDCO will start working on the metro line 8 project as soon as the DPR is approved. Around seven stations are now being considered for the line, which will be 40 kilometres long.
You’re looking for Projects in Mahim we have the Best Properties In Mumbai Like Ready to Move:https://navimumbaihouses.com/properties/search/mahim/
If you want daily property update details please follow us on Facebook Page / YouTube Channel / Twitter