
Learn All About Mumbai Metro Line 12 From Kalyan To Taloja
On March 3, 2024, Maharashtra’s Chief Minister, Eknath Shinde, lay the cornerstone for the Mumbai Metro Orange Line extension, commonly known as Line 12. The new elevated corridor, measuring 22.17 km in length, will cut the travel time between Kalyan APMC & Amandoot, Taloja by forty-five minutes. To learn more about Mumbai Metro Line 12’s route, stations, hours, and cost, keep reading.
Are you searching flat for rent in kharghar?
There are now 14 metro lines operated by the Mumbai Metropolitan Region Development Authority (MMRDA), in addition to other proposed and ongoing projects. Over 225 stations spread across multiple routes will make up the approximately 337 km that the metro network is projected to traverse. The Orange Line, which links the thriving Mumbai city centre to the suburbs of Kalyan, Dombivali, Thane, & Navi Mumbai, is one of its main routes. An extension of Mumbai Metro’s Line 5, Line 12 was created to improve accessibility, offer convenience, and shorten travel times during peak hours. Let’s examine the salient features of the proposed Mumbai Metro Line 5, including its route, layout, cost, schedule, present situation, and effect on real estate.
Key Details about Mumbai Metro Line 12
It is anticipate that Mumbai Metro Line 12 would play a crucial role in the public transit system. The project aims to reduce traffic congestion and improve intra-city connection. Here are some of its main points of interest:
Key details of Mumbai Metro Line 12 | |
Project cost | About Rs 5,865 crore |
Number of stations | 19 |
Length | 22.17 km |
Route | Kalyan to Taloja |
Type of construction | Elevated |
Route & map for Mumbai Metro Line 12
Starting from Kalyan East, Mumbai Metro Line 12 travels past important stations like Ganesh Nagar, Golavali, & Dombivali MIDC. After passing through Hedutane, Nilje Gaon, & Vadavali, the line ends in Taloja. For a comprehensive list of all the stations along Mumbai Metro Line 12, see the table below:
Stations on Mumbai Metro Line 12 | |
Kalyan APMC | Kolegaon |
Kalyan | Nilaje Gaon |
Ganesh Nagar (Kalyan) | Vadavali |
Pisavali Gaon | Bale |
Golavali | Waklan |
Dombivali MIDC | Turbhe |
Sagaon | Pisarve Depot |
Sonarpada | Pisarve |
Manpada (Dombivali East) | Amandoot (Taloja) |
Hedutane |
Mumbai Metro Line 12: Fare and Timings
While the times and prices for Line 14 are still being considered, the Mumbai Metro Line 12 tariff is expected to be decided upon shortly. It is anticipated to run for the convenience of commuters from 6:00 AM to 11:00 PM. It is anticipated that MMMOCL will maintain the fare at the present price guidelines:
Distance range (Km) | Single journey ticket (Rs) |
0-3 | 10 |
12-Mar | 20 |
18-Dec | 30 |
18-24 | 40 |
24-30 | 50 |
30- 36 | 60 |
36-42 | 70 |
More than 42 | 80 |
Latest updates on Mumbai Metro Line 12 (March 2024)
The Mumbai Metro Line 12 was inaugurated on March 3, 2024, by Maharashtra’s Chief Minister, Eknath Shinde. The CM said during the inauguration that the line will usher in a new era of development for the MMR area. The new route would greatly shorten and improve the convenience of travel connecting several areas of MMR, including Taloja to Kalyan, South Mumbai, Thane, Mira Bhayandar, and Virar. When the new line is finished, it will cut the travel time between Taloja & Kalyan by forty-five minutes, he continued.
December 2023
The elevated stretch of Metro Line 12 with 19 stations was to be built by the Mumbai Metropolitan Region Development Authority (MMRDA) and tenders valued at Rs 1,877 crore were invited in December 2023. This building project has a 30-month completion date planned. In addition, bids for civil construction work were submitted by three companies: Gawar Constructions Ltd. (GCL), J Kumar Infraprojects Ltd. (JKIL), & Welspun Enterprises Ltd. (WEL).
Mumbai Metro Line 12: Real estate Impact
Along its path, Metro Line 12’s approved line has spurred development and growth in real estate. For commuters and locals alike, accessibility and convenience are enhanced by the metro line’s connection to Line 1 and Line 4 with Thane and Navi Mumbai. Notably, the major participants in the market, Lodha Group, Runwal, and Paradise, are drawn to the vicinity of Mumbai Metro’s Line 12 to create expansive township projects. Due to their proximity to Metro Line 12, important areas along the route, like Kalyan, Dombivali, and Taloja, are expected to see an increase in demand and property value.
By 2025, the Mumbai Metro’s Line 12 is anticipated to be operational, improving connectivity between Kalyan & Taloja. For the project, MMRDA has issue an invitation to tender, and work is expected to start in the upcoming months. Mumbai’s public transit and connectivity would be enhanced by the project through smart alignment & integration with other metro lines. Without a question, Mumbai Metro is a big step in the direction of a more sustainable and connected future.
You’re looking for Projects in Chembur have the Best Properties In Mumbai Like Ready to Move:https://navimumbaihouses.com/properties/search/chembur/
If you want daily property update details please follow us on Facebook Page / YouTube Channel / Twitter