{"id":52784,"date":"2021-09-20T13:35:46","date_gmt":"2021-09-20T08:05:46","guid":{"rendered":"https:\/\/navimumbaihouses.com\/blog\/?p=52784"},"modified":"2021-09-20T13:41:29","modified_gmt":"2021-09-20T08:11:29","slug":"navi-mumbai-metro-line-update","status":"publish","type":"post","link":"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/","title":{"rendered":"Navi Mumbai Metro Line Update | Navi Mumbai Metro Line First Trials Complete"},"content":{"rendered":"<p>The City &amp; Industrial Development Corporation (CIDCO), Navi Mumbai&#8217;s Nodal Agency for Metro Development, Plans to activate a section of Metro Line 1 from Metro Stations 7 to 11 for Operations.<\/p>\n<p><img class=\"alignnone size-full wp-image-52786\" src=\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2021\/09\/Navi-Mumbai-Oscillation-Trials-The-first-metro-line-has-been-finished.-1.jpg\" alt=\"Navi Mumbai Metro Line Update \" width=\"100%\" srcset=\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2021\/09\/Navi-Mumbai-Oscillation-Trials-The-first-metro-line-has-been-finished.-1.jpg 820w, https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2021\/09\/Navi-Mumbai-Oscillation-Trials-The-first-metro-line-has-been-finished.-1-300x227.jpg 300w, https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2021\/09\/Navi-Mumbai-Oscillation-Trials-The-first-metro-line-has-been-finished.-1-768x581.jpg 768w\" sizes=\"(max-width: 820px) 100vw, 820px\" \/><\/p>\n<h2><strong>Navi Mumbai Oscillation Trials The first metro line has been finished.<\/strong><\/h2>\n<p>The Navi Mumbai Metro line one oscillation trials, which covered a distance of 5.14 kilometers from Pendhar Station to Central Park Station, were just completed.<\/p>\n<p>Oscillation and emergency braking distance (EBD) experiments were conducted by the Research Design and Structured Organization (RDSO), and the coaches were evaluated on a variety of factors, including speed, weight, and braking.<\/p>\n<p>&nbsp;<\/p>\n<h3><strong>The hearings began on August 28 and lasted through Tuesday.<\/strong><\/h3>\n<p>The team will now submit their report to the Commissioner of Railway Safety (CRS), following which the Railway Safety Commissioner will inspect the route. The Security Commissioner ate will then make a decision on the matter. CIDCO and the state government will decide whether or not to provide this service to the public after getting clearance and certification from the railway board.<\/p>\n<p>The oscillation experiments were carried out to assure the safety and quality of the trips by testing the dynamic behaviour of the rolling stock or Metro vehicles in various situations.<\/p>\n<p>&nbsp;<\/p>\n<h3><strong>Information, Route Maps, Tenders, and Updates for the Navi Mumbai Metro<\/strong><\/h3>\n<p><img class=\"alignnone size-full wp-image-52787\" src=\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2021\/09\/Navi-Mumbai-Oscillation-Trials-The-first-metro-line-has-been-finished.-2.jpg\" alt=\"Navi Mumbai Metro Line Update \" width=\"100%\" srcset=\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2021\/09\/Navi-Mumbai-Oscillation-Trials-The-first-metro-line-has-been-finished.-2.jpg 820w, https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2021\/09\/Navi-Mumbai-Oscillation-Trials-The-first-metro-line-has-been-finished.-2-300x227.jpg 300w, https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2021\/09\/Navi-Mumbai-Oscillation-Trials-The-first-metro-line-has-been-finished.-2-768x581.jpg 768w\" sizes=\"(max-width: 820px) 100vw, 820px\" \/><\/p>\n<h3><strong>Information<\/strong><\/h3>\n<p><a href=\"https:\/\/navimumbaihouses.com\/\">Navi Mumbai<\/a> is a city in India. The Metro is a one-line urban mass rapid transit system (MRTS) being developed by the City and Industrial Development Corporation to service the Navi Mumbai area (Belapur, Kharghar, Taloja, and other areas) in Maharashtra (CIDCO).<\/p>\n<p>Construction on Navi Mumbai Metro&#8217;s 11.10 km Phase 1 line from CBD Belapur to Pendhar with 11 stations began in November 2011 and is expected to be completed by 2023 due to delays in receiving key approvals, poor project management by the operator and contractors involved, and a lack of general interest by the state government.<\/p>\n<p>The Maharashtra government has produced a 106.40 km master plan with six lines, however it is unlikely to be implemented. The development of the Navi Mumbai Airport in Ulwe is likely to impact the announcement of new metro lines in the future years.<\/p>\n<p>The City and Industrial Development Corporation (CIDCO) of Navi Mumbai gave an in-principle clearance to entrust DMRC with executing the city&#8217;s Line-2 and Line-3 in June 2019, after which DMRC began locally hiring for various positions in October.<\/p>\n<p>&nbsp;<\/p>\n<h3><strong>Specifications for the System<\/strong><\/h3>\n<p>&#8211; Top Speed: 80 kmph<\/p>\n<p>&#8211; Average Speed: 34 kmph<\/p>\n<p>&#8211; Track Gauge: Standard Gauge \u2013 1435 mm<\/p>\n<p>&#8211; Electrification: 25 kV, 50 Hz AC OHE<\/p>\n<p>&#8211; Signalling: Cab Signalling\/Distance to Go<\/p>\n<p>&nbsp;<\/p>\n<h3><strong>Metro Routes in Navi Mumbai (Under Construction)<\/strong><\/h3>\n<p><strong>&#8211; Line-1:<\/strong> CBD Belapur \u2013 Pendhar<\/p>\n<p><strong>&#8211; Length:<\/strong> 11.10 km<\/p>\n<p><strong>&#8211; Estimated Cost:<\/strong> Rs. 3063.63 cr<\/p>\n<p><strong>&#8211; Type:<\/strong> Elevated<\/p>\n<p><strong>&#8211; Depot:<\/strong> Taloja<\/p>\n<p>&nbsp;<\/p>\n<p><strong>There are 11 stations in all.<\/strong><\/p>\n<p><strong>Names of the 11 stations:<\/strong> 1. CBD Belapur, 2. Sector 7, 3. CIDCO Science Park, 4. Utsav Chowk (Khargar), 5. Sector 11, 6. Sector 14, 7. Central Park, 8. Pethpada, 9. Sector 34, 10. Panchanand &amp; 11. Pendhar<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Metro Fares in Navi Mumbai (Ticket Prices)<\/strong><\/p>\n<p>The pricing system, rates, and restrictions for the Navi Mumbai Metro have yet to be published. CIDCO (as a Maha Mumbai Metro network stakeholder) intends to integrate cutting-edge technology in its automated fare collecting (AFC) system, allowing QR codes and Near Field Communication (NFC) phones to be used.<\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p>&nbsp;<\/p>\n<p>We are the<strong>\u00a0Real Estate Web Portal<\/strong>\u00a0to\u00a0<strong>Buy Sell<\/strong>\u00a0and <strong>Rent<\/strong>,\u00a0<strong><a href=\"https:\/\/navimumbaihouses.com\/property\/search\/buy\/kharghar\/\">Flat in Kharghar<\/a><\/strong><strong>, Navi Mumbai<\/strong>,\u00a0<strong>Mumbai<\/strong>, and\u00a0<strong>Thane<\/strong>. We can help you\u00a0<strong>Buy Properties at Affordable Prices in Navi Mumbai<\/strong>\u00a0at your desired location. For more information,\u00a0<strong>Call Us On +91 8433959100<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>If you want daily property update details please follow us on\u00a0<\/strong><a href=\"https:\/\/www.facebook.com\/navimumbai.houses\/\"><strong>Facebook Page<\/strong><\/a><strong>\u00a0\/\u00a0<\/strong><a href=\"https:\/\/www.youtube.com\/channel\/UCJj_M-KlNliMtr_GybNL-Mg?view_as=subscriber\"><strong>YouTube\u00a0Channel<\/strong><\/a><strong>\u00a0\/\u00a0<\/strong><a href=\"https:\/\/twitter.com\/NaviMum_Houses\"><strong>Twitter<\/strong><\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The City &amp; Industrial Development Corporation (CIDCO), Navi Mumbai&#8217;s Nodal Agency for Metro Development, Plans to activate a section of Metro Line 1 from Metro Stations 7 to 11 for Operations. Navi Mumbai Oscillation Trials The first metro line has been finished. The Navi Mumbai Metro line one oscillation trials, which covered a distance of [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":52785,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[8318],"tags":[14858,14168,14857,14856,12743],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Navi Mumbai Metro Line Update | Navi Mumbai Metro First Trials Complete<\/title>\n<meta name=\"description\" content=\"The (CIDCO), Navi Mumbai&#039;s nodal agency for Metro development, plans to activate a section of Metro line 1 from Metro stations 7 to 11.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Navi Mumbai Metro Line Update | Navi Mumbai Metro First Trials Complete\" \/>\n<meta property=\"og:description\" content=\"The (CIDCO), Navi Mumbai&#039;s nodal agency for Metro development, plans to activate a section of Metro line 1 from Metro stations 7 to 11.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/navimumbai.houses\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-09-20T08:05:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-09-20T08:11:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2021\/09\/Navi-Mumbai-Oscillation-Trials-The-first-metro-line-has-been-finished..jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"820\" \/>\n\t<meta property=\"og:image:height\" content=\"620\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:creator\" content=\"@navimumbaihouse\" \/>\n<meta name=\"twitter:site\" content=\"@navimumbaihouse\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"NMH Team\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#website\",\"url\":\"https:\/\/navimumbaihouses.com\/blog\/\",\"name\":\"\",\"description\":\"Real Estate | Property in Navi Mumbai| Buy\/Sale\/Rent Properties Navi Mumbai\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/navimumbaihouses.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2021\/09\/Navi-Mumbai-Oscillation-Trials-The-first-metro-line-has-been-finished..jpg\",\"contentUrl\":\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2021\/09\/Navi-Mumbai-Oscillation-Trials-The-first-metro-line-has-been-finished..jpg\",\"width\":820,\"height\":620,\"caption\":\"Navi Mumbai Metro Line Map\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/#webpage\",\"url\":\"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/\",\"name\":\"Navi Mumbai Metro Line Update | Navi Mumbai Metro First Trials Complete\",\"isPartOf\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/#primaryimage\"},\"datePublished\":\"2021-09-20T08:05:46+00:00\",\"dateModified\":\"2021-09-20T08:11:29+00:00\",\"author\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/5c512950a241e3309e47a57fc0650d31\"},\"description\":\"The (CIDCO), Navi Mumbai's nodal agency for Metro development, plans to activate a section of Metro line 1 from Metro stations 7 to 11.\",\"breadcrumb\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/navimumbaihouses.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Navi Mumbai Metro Line Update | Navi Mumbai Metro Line First Trials Complete\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/5c512950a241e3309e47a57fc0650d31\",\"name\":\"NMH Team\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Navi Mumbai Metro Line Update | Navi Mumbai Metro First Trials Complete","description":"The (CIDCO), Navi Mumbai's nodal agency for Metro development, plans to activate a section of Metro line 1 from Metro stations 7 to 11.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/","og_locale":"en_US","og_type":"article","og_title":"Navi Mumbai Metro Line Update | Navi Mumbai Metro First Trials Complete","og_description":"The (CIDCO), Navi Mumbai's nodal agency for Metro development, plans to activate a section of Metro line 1 from Metro stations 7 to 11.","og_url":"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/","article_publisher":"https:\/\/www.facebook.com\/navimumbai.houses\/","article_published_time":"2021-09-20T08:05:46+00:00","article_modified_time":"2021-09-20T08:11:29+00:00","og_image":[{"width":820,"height":620,"url":"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2021\/09\/Navi-Mumbai-Oscillation-Trials-The-first-metro-line-has-been-finished..jpg","type":"image\/jpeg"}],"twitter_card":"summary","twitter_creator":"@navimumbaihouse","twitter_site":"@navimumbaihouse","twitter_misc":{"Written by":"NMH Team","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/navimumbaihouses.com\/blog\/#website","url":"https:\/\/navimumbaihouses.com\/blog\/","name":"","description":"Real Estate | Property in Navi Mumbai| Buy\/Sale\/Rent Properties Navi Mumbai","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/navimumbaihouses.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/#primaryimage","inLanguage":"en-US","url":"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2021\/09\/Navi-Mumbai-Oscillation-Trials-The-first-metro-line-has-been-finished..jpg","contentUrl":"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2021\/09\/Navi-Mumbai-Oscillation-Trials-The-first-metro-line-has-been-finished..jpg","width":820,"height":620,"caption":"Navi Mumbai Metro Line Map"},{"@type":"WebPage","@id":"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/#webpage","url":"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/","name":"Navi Mumbai Metro Line Update | Navi Mumbai Metro First Trials Complete","isPartOf":{"@id":"https:\/\/navimumbaihouses.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/#primaryimage"},"datePublished":"2021-09-20T08:05:46+00:00","dateModified":"2021-09-20T08:11:29+00:00","author":{"@id":"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/5c512950a241e3309e47a57fc0650d31"},"description":"The (CIDCO), Navi Mumbai's nodal agency for Metro development, plans to activate a section of Metro line 1 from Metro stations 7 to 11.","breadcrumb":{"@id":"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/navimumbaihouses.com\/blog\/news\/navi-mumbai-metro-line-update\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/navimumbaihouses.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Navi Mumbai Metro Line Update | Navi Mumbai Metro Line First Trials Complete"}]},{"@type":"Person","@id":"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/5c512950a241e3309e47a57fc0650d31","name":"NMH Team"}]}},"_links":{"self":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts\/52784"}],"collection":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/comments?post=52784"}],"version-history":[{"count":0,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts\/52784\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/media\/52785"}],"wp:attachment":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/media?parent=52784"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/categories?post=52784"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/tags?post=52784"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}