{"id":63416,"date":"2022-11-14T11:49:19","date_gmt":"2022-11-14T06:19:19","guid":{"rendered":"https:\/\/navimumbaihouses.com\/blog\/?p=63416"},"modified":"2022-11-14T11:49:19","modified_gmt":"2022-11-14T06:19:19","slug":"mumbai-metro-yellow-line","status":"publish","type":"post","link":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/","title":{"rendered":"Mumbai Metro Yellow Line"},"content":{"rendered":"<p>Mumbai&#8217;s entire metropolis is well connected by a system of metro lines. The second metro line that connects Dahisar East and Mandale with as many as 37 stations is the yellow line. Fully elevated, the 42.20 kilometre under construction metro line. The yellow line&#8217;s first 9.5 km (Phase 1) was constructed and opened in April 2022. It connected Dahisar East and D.N. Nagar via 10 stations the same day it was made operational for the general public.<\/p>\n<hr \/>\n<p><strong>Are you searching for <a href=\"https:\/\/navimumbaihouses.com\/property\/search\/buy\/kurla\/\">flats in kurla?<\/a><\/strong><\/p>\n<hr \/>\n<p><strong>\u00a0<\/strong><\/p>\n<p>The Mumbai Metropolitan Region Development Authority owns this yellow line metro (MMRDA). Through a number of interchanges throughout its path, the line connects to all other metro lines, suburban rail services, &amp; bus terminals. The construction of three bridges\u2014at the BKC Entry, Mithi River Crossing, &amp; Vakola Nalla Crossing\u2014along the yellow line metro route is also being considered by the government.<\/p>\n<p>&nbsp;<\/p>\n<h2>Mumbai Yellow Line Metro<\/h2>\n<p>This 42-km long metro route is part of Mumbai&#8217;s metro system and is also referred to as the Yellow Line. Line 2A and Line 2B are two sub-sections of the Yellow Line. The former is an 18-km long corridor with a total of 17 metro stations that connects Dahisar to D.N. Nagar. According to sources, the MMRDA renamed 15 of these 17 metro stations because the locals requested more precise addresses.<\/p>\n<p>On the other hand, the 2B segment connects DN Nagar, BKC, &amp; Mankhurd across a distance of 23.5 kilometres. In April of this year, the 9.5 km long first phase of the 2A line went into operation. Between\u00a0Eksar,\u00a0Dahisar,\u00a0Anand Nagar, Pahadi Eksar, Kandivali West,\u00a0IC Colony, Borivali West, Kandarpada, &amp; Dhanukarwadi, it stops at 9 stations.<\/p>\n<p>&nbsp;<\/p>\n<h2>Mumbai Yellow Line Metro Quick Facts<\/h2>\n<table>\n<tbody>\n<tr>\n<td width=\"213\"><strong>Yellow line<\/strong><\/td>\n<td width=\"213\"><strong>2A<\/strong><\/td>\n<td width=\"213\"><strong>2B<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"213\">Length<\/td>\n<td width=\"213\">18.5 km<\/td>\n<td width=\"213\">23.6 km<\/td>\n<\/tr>\n<tr>\n<td width=\"213\">Type<\/td>\n<td width=\"213\">Elevated<\/td>\n<td width=\"213\">Elevated<\/td>\n<\/tr>\n<tr>\n<td width=\"213\">Number of stations<\/td>\n<td width=\"213\">17<\/td>\n<td width=\"213\">20<\/td>\n<\/tr>\n<tr>\n<td width=\"213\">Status<\/td>\n<td width=\"213\">9 stations are operational<\/td>\n<td width=\"213\">Under construction<\/td>\n<\/tr>\n<tr>\n<td width=\"213\">Estimated cost<\/td>\n<td width=\"213\">Rs 6,410 crore<\/td>\n<td width=\"213\">Rs 10,986 crore<\/td>\n<\/tr>\n<tr>\n<td width=\"213\">Estimated ridership<\/td>\n<td width=\"213\">4.07 lakh\/ day (2021)<\/td>\n<td width=\"213\">&#8211;<\/td>\n<\/tr>\n<tr>\n<td width=\"213\">Stretch<\/td>\n<td width=\"213\">Dahisar East to D.N. Nagar<\/td>\n<td width=\"213\">ESIC Nagar to Mankhurd &amp; Mandale<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<h2>Metro Stations along Yellow Line Metro Route (2A)<\/h2>\n<p>The stations connected by Mumbai&#8217;s yellow line metro are listed below (2A). This metro line has 17 stops, all of which are completely elevated.<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"160\"><strong>Sr. No<\/strong><\/td>\n<td width=\"160\"><strong>Station Name<\/strong><\/td>\n<td width=\"160\"><strong>Type<\/strong><\/td>\n<td width=\"160\"><strong>Status<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"160\">1<\/td>\n<td width=\"160\">Dahisar (East)<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Operational<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">2<\/td>\n<td width=\"160\">Anand Nagar<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Operational<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">3<\/td>\n<td width=\"160\">Kandarpada<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Operational<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">4<\/td>\n<td width=\"160\">Mandapeshwar<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Operational<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">5<\/td>\n<td width=\"160\">Eksar<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Operational<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">6<\/td>\n<td width=\"160\">Borivali (West)<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Operational<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">7<\/td>\n<td width=\"160\">Pahadi Eksar<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Operational<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">8<\/td>\n<td width=\"160\">Kandivali (West)<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Operational<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">9<\/td>\n<td width=\"160\">Dahanukarwadi<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Operational<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">10<\/td>\n<td width=\"160\">Valnai<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">11<\/td>\n<td width=\"160\">Malad (West)<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">12<\/td>\n<td width=\"160\">Lower Malad<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">13<\/td>\n<td width=\"160\">Pahadi Goregaon<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">14<\/td>\n<td width=\"160\">Goregaon (West)<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">15<\/td>\n<td width=\"160\">Oshiwara<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">16<\/td>\n<td width=\"160\">Lower Oshiwara<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">17<\/td>\n<td width=\"160\">D.N. Nagar<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<h2>Metro Stations along Yellow Line Metro Route (2B)<\/h2>\n<p>The stations in Mumbai that are connected by the Yellow Line Metro (2B) are listed below. This metro line has 20 stops in all, and each one is entirely elevated.<\/p>\n<table style=\"height: 1360px;\" width=\"546\">\n<tbody>\n<tr>\n<td width=\"160\"><strong>Sr. No.<\/strong><\/td>\n<td width=\"160\"><strong>Station Name<\/strong><\/td>\n<td width=\"160\"><strong>Type<\/strong><\/td>\n<td width=\"160\"><strong>Status<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"160\">1<\/td>\n<td width=\"160\">ESIC Nagar<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">2<\/td>\n<td width=\"160\">Prem Nagar<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">3<\/td>\n<td width=\"160\">Indira Nagar<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">4<\/td>\n<td width=\"160\">Nanavati Hospital<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">5<\/td>\n<td width=\"160\">Khira Nagar<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">6<\/td>\n<td width=\"160\">Saraswat Nagar<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">7<\/td>\n<td width=\"160\">National College<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">8<\/td>\n<td width=\"160\">Bandra Metro<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">9<\/td>\n<td width=\"160\">ITO Bandra Kurla Complex<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">10<\/td>\n<td width=\"160\">IL&amp;FS, Bandra Kurla Complex (BKC)<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">11<\/td>\n<td width=\"160\">MTNL, Bandra Kurla Complex (BKC)<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">12<\/td>\n<td width=\"160\">SG Barve Marg<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">13<\/td>\n<td width=\"160\">Kurla East<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">14<\/td>\n<td width=\"160\">Eastern Express Highway (EEH)<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">15<\/td>\n<td width=\"160\">Chembur<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">16<\/td>\n<td width=\"160\">Diamond Garden<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">17<\/td>\n<td width=\"160\">Shivaji Chowk<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">18<\/td>\n<td width=\"160\">BSNL<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">19<\/td>\n<td width=\"160\">Mankhurd<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">20<\/td>\n<td width=\"160\">Mandala<\/td>\n<td width=\"160\">Elevated<\/td>\n<td width=\"160\">Under Construction<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>One of Mumbai&#8217;s longest metro lines is the yellow line. While 2A is thought to be 18.5 km long, 2B is stretched out to approximately 23 km.<\/p>\n<p>&nbsp;<\/p>\n<h2>Metro Yellow Line Route Map<\/h2>\n<p><img class=\"alignnone size-medium wp-image-63419\" src=\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2022\/11\/pidoyhfufvghdxksd-800x400.jpg\" alt=\"Mumbai Metro Yellow Line\" width=\"100%\" srcset=\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2022\/11\/pidoyhfufvghdxksd-800x400.jpg 800w, https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2022\/11\/pidoyhfufvghdxksd-768x384.jpg 768w, https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2022\/11\/pidoyhfufvghdxksd.jpg 840w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<p>Here is the Mumbai metro&#8217;s yellow line&#8217;s official route map. At some point, it connects with all the other lines, providing easy access to the city&#8217;s numerous neighbourhoods.<\/p>\n<p><img class=\"alignnone size-medium wp-image-63420\" src=\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2022\/11\/jshdugdfydh-800x400.jpg\" alt=\"Mumbai Metro Yellow Line\" width=\"100%\" srcset=\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2022\/11\/jshdugdfydh-800x400.jpg 800w, https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2022\/11\/jshdugdfydh-768x384.jpg 768w, https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2022\/11\/jshdugdfydh.jpg 840w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<p>&nbsp;<\/p>\n<h2>Metro Yellow Line Schedule<\/h2>\n<p>The Mumbai yellow metro line is being built to make transportation simpler for city residents. While line 2B is still being built, line 2A is currently only partially operational. Trains will operate every 10 to 11 minutes from 6 AM to 10 PM when the line is fully operating.<\/p>\n<p>It&#8217;s possible that the first train won&#8217;t arrive at every station at precisely the same time. Additionally, the frequency varies from busiest business hours to regular hours.<\/p>\n<p>&nbsp;<\/p>\n<h2>Metro Yellow Line Route Cost<\/h2>\n<p>The yellow line metro fare in Mumbai is calculated based on the passenger&#8217;s distance travelled. The metro fare is typically determined as follows:<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"319\"><strong>Distance Covered<\/strong><\/td>\n<td width=\"319\"><strong>Metro Fare<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"319\">3-12 km<\/td>\n<td width=\"319\">Rs 20<\/td>\n<\/tr>\n<tr>\n<td width=\"319\">12-18 km<\/td>\n<td width=\"319\">Rs 30<\/td>\n<\/tr>\n<tr>\n<td width=\"319\">18-24 km<\/td>\n<td width=\"319\">Rs 40<\/td>\n<\/tr>\n<tr>\n<td width=\"319\">24-30 km<\/td>\n<td width=\"319\">Rs 50<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>Regular metro riders will soon be able to purchase a Trip Pass that is good for 45 trips over 30 days. A Rs. 50 security deposit is required of the cardholder and is entirely refundable.<\/p>\n<p>&nbsp;<\/p>\n<h2>Key Metro Stations on the Yellow Line<\/h2>\n<p>Here are some of the important stops along the Mumbai metro&#8217;s yellow line:<\/p>\n<p><span style=\"text-decoration: underline;\"><strong>Dahisar (East):<\/strong> <\/span>The beginning station of Mumbai&#8217;s yellow line metro is Dahisar (East). Phase One of Line 2A, or April 2022, saw the opening of the metro station. Travelers may take advantage of all the newest amenities at this tastefully constructed and spotless metro station.<\/p>\n<p><span style=\"text-decoration: underline;\"><strong>Dahanukarwadi:<\/strong> <\/span>On Mumbai&#8217;s yellow line metro, Dahanukarwadi is now the final station that is still in use. This recently constructed station is just 940 metres from the Kandivali (West) metro station and is situated on the New Link Road.<\/p>\n<p><span style=\"text-decoration: underline;\"><strong>D.N. Nagar:<\/strong><\/span> On Mumbai&#8217;s still-under-construction yellow line 2A, this is the final metro station. This station, which is scheduled to open in 2023, will be connected to Blue Line 1.<\/p>\n<p>&nbsp;<\/p>\n<h2>The terminus of the Yellow Line Metro route<\/h2>\n<p>The Mumbai yellow metro line offers seamless access to all areas of the city by covering key locations. However, it is currently just partially functional. Once completely operational, commuters will be able to quickly and easily travel from Dahisar to D.N. Nagar as well as from ESIC Nagar to Mandala.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p>You\u2019re looking for\u00a0<b>Projects<\/b>\u00a0in\u00a0<strong>Kharghar\u00a0<\/strong>we have the Best Properties In\u00a0<strong>Navi<\/strong>\u00a0<strong>Mumbai<\/strong>\u00a0Like\u00a0<strong>Ready to Move<\/strong>:<span style=\"color: #ff0000;\"><strong><a style=\"color: #ff0000;\" href=\"https:\/\/navimumbaihouses.com\/properties\/search\/kharghar\/\">https:\/\/navimumbaihouses.com\/properties\/search\/kharghar\/<\/a><\/strong><\/span><\/p>\n<p>If\u00a0you want\u00a0<strong>daily property update details<\/strong>\u00a0please follow us on\u00a0<span style=\"color: #ff0000;\"><a style=\"color: #ff0000;\" href=\"https:\/\/www.facebook.com\/navimumbai.houses\/\"><strong>Facebook Page<\/strong><\/a><strong>\u00a0\/\u00a0<\/strong><a style=\"color: #ff0000;\" href=\"https:\/\/www.youtube.com\/channel\/UCJj_M-KlNliMtr_GybNL-Mg?view_as=subscriber\"><strong>YouTube\u00a0Channel<\/strong><\/a><strong>\u00a0\/\u00a0<\/strong><a style=\"color: #ff0000;\" href=\"https:\/\/twitter.com\/NaviMum_Houses\"><strong>Twitter<\/strong><\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mumbai&#8217;s entire metropolis is well connected by a system of metro lines. The second metro line that connects Dahisar East and Mandale with as many as 37 stations is the yellow line. Fully elevated, the 42.20 kilometre under construction metro line. The yellow line&#8217;s first 9.5 km (Phase 1) was constructed and opened in April [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":63418,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[8319,8318],"tags":[18521,18520,18518,18519,14264,18516,18517,18522],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Mumbai Metro Yellow Line<\/title>\n<meta name=\"description\" content=\"Mumbai&#039;s entire metropolis is well connected by a system of metro lines. The second Mumbai Metro Yellow Line that connects Dahisar East\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mumbai Metro Yellow Line\" \/>\n<meta property=\"og:description\" content=\"Mumbai&#039;s entire metropolis is well connected by a system of metro lines. The second Mumbai Metro Yellow Line that connects Dahisar East\" \/>\n<meta property=\"og:url\" content=\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/navimumbai.houses\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-11-14T06:19:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2022\/11\/Mumbai-Metro-Yellow-Line.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:creator\" content=\"@navimumbaihouse\" \/>\n<meta name=\"twitter:site\" content=\"@navimumbaihouse\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Yamuna\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#website\",\"url\":\"https:\/\/navimumbaihouses.com\/blog\/\",\"name\":\"\",\"description\":\"Real Estate | Property in Navi Mumbai| Buy\/Sale\/Rent Properties Navi Mumbai\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/navimumbaihouses.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2022\/11\/Mumbai-Metro-Yellow-Line.jpg\",\"contentUrl\":\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2022\/11\/Mumbai-Metro-Yellow-Line.jpg\",\"width\":1200,\"height\":600,\"caption\":\"Mumbai Metro Yellow Line\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/#webpage\",\"url\":\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/\",\"name\":\"Mumbai Metro Yellow Line\",\"isPartOf\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/#primaryimage\"},\"datePublished\":\"2022-11-14T06:19:19+00:00\",\"dateModified\":\"2022-11-14T06:19:19+00:00\",\"author\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca\"},\"description\":\"Mumbai's entire metropolis is well connected by a system of metro lines. The second Mumbai Metro Yellow Line that connects Dahisar East\",\"breadcrumb\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/navimumbaihouses.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mumbai Metro Yellow Line\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca\",\"name\":\"Yamuna\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Mumbai Metro Yellow Line","description":"Mumbai's entire metropolis is well connected by a system of metro lines. The second Mumbai Metro Yellow Line that connects Dahisar East","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/","og_locale":"en_US","og_type":"article","og_title":"Mumbai Metro Yellow Line","og_description":"Mumbai's entire metropolis is well connected by a system of metro lines. The second Mumbai Metro Yellow Line that connects Dahisar East","og_url":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/","article_publisher":"https:\/\/www.facebook.com\/navimumbai.houses\/","article_published_time":"2022-11-14T06:19:19+00:00","og_image":[{"width":1200,"height":600,"url":"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2022\/11\/Mumbai-Metro-Yellow-Line.jpg","type":"image\/jpeg"}],"twitter_card":"summary","twitter_creator":"@navimumbaihouse","twitter_site":"@navimumbaihouse","twitter_misc":{"Written by":"Yamuna","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/navimumbaihouses.com\/blog\/#website","url":"https:\/\/navimumbaihouses.com\/blog\/","name":"","description":"Real Estate | Property in Navi Mumbai| Buy\/Sale\/Rent Properties Navi Mumbai","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/navimumbaihouses.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/#primaryimage","inLanguage":"en-US","url":"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2022\/11\/Mumbai-Metro-Yellow-Line.jpg","contentUrl":"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2022\/11\/Mumbai-Metro-Yellow-Line.jpg","width":1200,"height":600,"caption":"Mumbai Metro Yellow Line"},{"@type":"WebPage","@id":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/#webpage","url":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/","name":"Mumbai Metro Yellow Line","isPartOf":{"@id":"https:\/\/navimumbaihouses.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/#primaryimage"},"datePublished":"2022-11-14T06:19:19+00:00","dateModified":"2022-11-14T06:19:19+00:00","author":{"@id":"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca"},"description":"Mumbai's entire metropolis is well connected by a system of metro lines. The second Mumbai Metro Yellow Line that connects Dahisar East","breadcrumb":{"@id":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-metro-yellow-line\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/navimumbaihouses.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Mumbai Metro Yellow Line"}]},{"@type":"Person","@id":"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca","name":"Yamuna"}]}},"_links":{"self":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts\/63416"}],"collection":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/comments?post=63416"}],"version-history":[{"count":1,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts\/63416\/revisions"}],"predecessor-version":[{"id":63421,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts\/63416\/revisions\/63421"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/media\/63418"}],"wp:attachment":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/media?parent=63416"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/categories?post=63416"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/tags?post=63416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}