{"id":66495,"date":"2023-03-09T12:02:25","date_gmt":"2023-03-09T06:32:25","guid":{"rendered":"https:\/\/navimumbaihouses.com\/blog\/?p=66495"},"modified":"2023-03-09T12:02:25","modified_gmt":"2023-03-09T06:32:25","slug":"operations-for-mumbai-metro-2b","status":"publish","type":"post","link":"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/","title":{"rendered":"Partial Operations For Mumbai Metro 2B Will Begin In 2024"},"content":{"rendered":"<p>By 2024, MMRDA expects Mumbai Metro Line 2B between Mandale Depot &amp; <a href=\"https:\/\/navimumbaihouses.com\/properties\/search\/chembur\/\">Chembur<\/a> to be partially operational. The <a href=\"https:\/\/navimumbaihouses.com\/properties\/search\/mumbai-all\/\">Mumbai<\/a> Metropolitan Region Development Authority (MMRDA)plans to start partial operations of the Mumbai Metro Line- 2B from Mandale Depot and Chembur in 2024. Five stations with a 5-kilometer length will begin operating.<\/p>\n<hr \/>\n<p><strong>Are you searching <span style=\"color: #ff0000;\"><a style=\"color: #ff0000;\" href=\"https:\/\/navimumbaihouses.com\/properties\/search\/andheri-\/\">new projects in Andheri?<\/a><\/span><\/strong><\/p>\n<hr \/>\n<p><strong>\u00a0<\/strong><\/p>\n<p>Now, the alignment work between Mandale &amp; Diamond Garden is around 70% finished. A double-deck Metro car depot with a 31-acre footprint that can accommodate up to 72 metro trains at once is being built at the Mandale depot, where more than 55% of the civil work has already been finish. Afterwards, operations will begin along the remaining 23.643 km, which runs from DN Nagar to Mandale.<\/p>\n<p>Mumbai Metro Line 2 is divided into two sections: Mandale Depot to Chembur &amp; Chembur to DN Nagar on Mumbai Metro Line 2B, and Mumbai Metro Line 2A, which recently began full operations. One of the three metro lines in the city, Mumbai Metro 2B links the city&#8217;s eastern and western suburbs. The estimated cost of building Metro Line 2B is Rs 10, 986 crores.<\/p>\n<p>&nbsp;<\/p>\n<h2>Mandale to Chembur stations of the Mumbai Metro Line 2B<\/h2>\n<p>Mandale<\/p>\n<p>Mankhurd<\/p>\n<p>BSNL<\/p>\n<p>Shivaji Chowk<\/p>\n<p>Diamond Garden<\/p>\n<p>&nbsp;<\/p>\n<h2>2B interchanges for the Mumbai Metro<\/h2>\n<p>ESIC Nagar, Mumbai Metro Line 7, or Red Line<\/p>\n<p>At the Income Tax Office &amp; BKC stations on the Mumbai Metro Line 3 or Aqua line<\/p>\n<p>at the Eastern Express Highway Station on the Green line or Line 4 of the Mumbai Metro.<\/p>\n<p>&nbsp;<\/p>\n<h2><a href=\"https:\/\/navimumbaihouses.com\/properties\/search\/ulhasnagar\/\">Ulhasnagar<\/a> is to receive an extension of the Mumbai Metro Line 5<\/h2>\n<p>The <a href=\"https:\/\/navimumbaihouses.com\/properties\/search\/thane-all\/\">Thane<\/a>&#8211;<a href=\"https:\/\/navimumbaihouses.com\/properties\/search\/bhiwandi\/\">Bhiwandi<\/a>&#8211;<a href=\"https:\/\/navimumbaihouses.com\/properties\/search\/kalyan\/\">Kalyan<\/a> Mumbai Metro-5 corridor or the Orange line from Kalyan to Ulhasnagar are both being extended by the MMRDA. Within the next two months, a route survey will be complete, and then a DPR will be create. Construction on the 8-km route will begin after government approval.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div id=\"title\" class=\"style-scope ytd-watch-metadata\" style=\"text-align: center;\"><span style=\"text-decoration: underline;\"><strong><span class=\"style-scope yt-formatted-string\" dir=\"auto\">2 BHK Flat For Sale Beyond Thane |\u00a0<\/span><a class=\"yt-simple-endpoint style-scope yt-formatted-string\" dir=\"auto\" spellcheck=\"false\" href=\"https:\/\/www.youtube.com\/hashtag\/2bhkflatforsale\">#2bhkflatforsale<\/a><span class=\"style-scope yt-formatted-string\" dir=\"auto\">\u00a0<\/span><a class=\"yt-simple-endpoint style-scope yt-formatted-string\" dir=\"auto\" spellcheck=\"false\" href=\"https:\/\/www.youtube.com\/hashtag\/thane\">#thane<\/a><span class=\"style-scope yt-formatted-string\" dir=\"auto\">\u00a0<\/span><a class=\"yt-simple-endpoint style-scope yt-formatted-string\" dir=\"auto\" spellcheck=\"false\" href=\"https:\/\/www.youtube.com\/hashtag\/viral\">#viral<\/a><\/strong><\/span><\/div>\n<p><iframe loading=\"lazy\" title=\"2 BHK Flat For Sale Beyond Thane | #2bhkflatforsale #thane #viral\" width=\"1024\" height=\"576\" src=\"https:\/\/www.youtube.com\/embed\/s3qp1L2F1zM?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" allowfullscreen><\/iframe><\/p>\n<p style=\"text-align: center;\"><span style=\"text-decoration: underline;\"><strong><a href=\"https:\/\/www.youtube.com\/@NavimumbaiHouses\">Video Source<\/a><\/strong><\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p>You\u2019re looking for\u00a0<b>Projects<\/b>\u00a0in<b>\u00a0Mulund\u00a0<\/b>we have the Best Properties In\u00a0<strong>Mumbai<\/strong>\u00a0Like\u00a0<strong>Ready to Move:<span style=\"color: #ff0000;\"><a style=\"color: #ff0000;\" href=\"https:\/\/navimumbaihouses.com\/properties\/search\/mulund\/\">https:\/\/navimumbaihouses.com\/properties\/search\/mulund\/<\/a><\/span><\/strong><\/p>\n<p>If\u00a0you want\u00a0<strong>daily property update details<\/strong>\u00a0please follow us on\u00a0<span style=\"color: #ff0000;\"><a style=\"color: #ff0000;\" href=\"https:\/\/www.facebook.com\/navimumbai.houses\/\"><strong>Facebook Page<\/strong><\/a><strong>\u00a0\/\u00a0<\/strong><a style=\"color: #ff0000;\" href=\"https:\/\/www.youtube.com\/channel\/UCJj_M-KlNliMtr_GybNL-Mg?view_as=subscriber\"><strong>YouTube\u00a0Channel<\/strong><\/a><strong>\u00a0\/\u00a0<\/strong><a style=\"color: #ff0000;\" href=\"https:\/\/twitter.com\/NaviMum_Houses\"><strong>Twitter<\/strong><\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>By 2024, MMRDA expects Mumbai Metro Line 2B between Mandale Depot &amp; Chembur to be partially operational. The Mumbai Metropolitan Region Development Authority (MMRDA)plans to start partial operations of the Mumbai Metro Line- 2B from Mandale Depot and Chembur in 2024. Five stations with a 5-kilometer length will begin operating. Are you searching new projects [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":66496,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[8318],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Partial operations for Mumbai Metro 2B will begin in 2024<\/title>\n<meta name=\"description\" content=\"By 2024, MMRDA expects Mumbai Metro Line 2B between Mandale Depot &amp; Chembur to be partially operational. The Mumbai Metropolitan Region\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Partial operations for Mumbai Metro 2B will begin in 2024\" \/>\n<meta property=\"og:description\" content=\"By 2024, MMRDA expects Mumbai Metro Line 2B between Mandale Depot &amp; Chembur to be partially operational. The Mumbai Metropolitan Region\" \/>\n<meta property=\"og:url\" content=\"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/navimumbai.houses\/\" \/>\n<meta property=\"article:published_time\" content=\"2023-03-09T06:32:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2023\/03\/Partial-Operations-For-Mumbai-Metro-2B-Will-Begin-In-2024.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:creator\" content=\"@navimumbaihouse\" \/>\n<meta name=\"twitter:site\" content=\"@navimumbaihouse\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Yamuna\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#website\",\"url\":\"https:\/\/navimumbaihouses.com\/blog\/\",\"name\":\"\",\"description\":\"Real Estate | Property in Navi Mumbai| Buy\/Sale\/Rent Properties Navi Mumbai\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/navimumbaihouses.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2023\/03\/Partial-Operations-For-Mumbai-Metro-2B-Will-Begin-In-2024.jpg\",\"contentUrl\":\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2023\/03\/Partial-Operations-For-Mumbai-Metro-2B-Will-Begin-In-2024.jpg\",\"width\":1200,\"height\":600,\"caption\":\"Partial Operations For Mumbai Metro 2B Will Begin In 2024\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/#webpage\",\"url\":\"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/\",\"name\":\"Partial operations for Mumbai Metro 2B will begin in 2024\",\"isPartOf\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/#primaryimage\"},\"datePublished\":\"2023-03-09T06:32:25+00:00\",\"dateModified\":\"2023-03-09T06:32:25+00:00\",\"author\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca\"},\"description\":\"By 2024, MMRDA expects Mumbai Metro Line 2B between Mandale Depot & Chembur to be partially operational. The Mumbai Metropolitan Region\",\"breadcrumb\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/navimumbaihouses.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Partial Operations For Mumbai Metro 2B Will Begin In 2024\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca\",\"name\":\"Yamuna\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Partial operations for Mumbai Metro 2B will begin in 2024","description":"By 2024, MMRDA expects Mumbai Metro Line 2B between Mandale Depot & Chembur to be partially operational. The Mumbai Metropolitan Region","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/","og_locale":"en_US","og_type":"article","og_title":"Partial operations for Mumbai Metro 2B will begin in 2024","og_description":"By 2024, MMRDA expects Mumbai Metro Line 2B between Mandale Depot & Chembur to be partially operational. The Mumbai Metropolitan Region","og_url":"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/","article_publisher":"https:\/\/www.facebook.com\/navimumbai.houses\/","article_published_time":"2023-03-09T06:32:25+00:00","og_image":[{"width":1200,"height":600,"url":"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2023\/03\/Partial-Operations-For-Mumbai-Metro-2B-Will-Begin-In-2024.jpg","type":"image\/jpeg"}],"twitter_card":"summary","twitter_creator":"@navimumbaihouse","twitter_site":"@navimumbaihouse","twitter_misc":{"Written by":"Yamuna","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/navimumbaihouses.com\/blog\/#website","url":"https:\/\/navimumbaihouses.com\/blog\/","name":"","description":"Real Estate | Property in Navi Mumbai| Buy\/Sale\/Rent Properties Navi Mumbai","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/navimumbaihouses.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/#primaryimage","inLanguage":"en-US","url":"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2023\/03\/Partial-Operations-For-Mumbai-Metro-2B-Will-Begin-In-2024.jpg","contentUrl":"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2023\/03\/Partial-Operations-For-Mumbai-Metro-2B-Will-Begin-In-2024.jpg","width":1200,"height":600,"caption":"Partial Operations For Mumbai Metro 2B Will Begin In 2024"},{"@type":"WebPage","@id":"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/#webpage","url":"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/","name":"Partial operations for Mumbai Metro 2B will begin in 2024","isPartOf":{"@id":"https:\/\/navimumbaihouses.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/#primaryimage"},"datePublished":"2023-03-09T06:32:25+00:00","dateModified":"2023-03-09T06:32:25+00:00","author":{"@id":"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca"},"description":"By 2024, MMRDA expects Mumbai Metro Line 2B between Mandale Depot & Chembur to be partially operational. The Mumbai Metropolitan Region","breadcrumb":{"@id":"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/navimumbaihouses.com\/blog\/news\/operations-for-mumbai-metro-2b\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/navimumbaihouses.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Partial Operations For Mumbai Metro 2B Will Begin In 2024"}]},{"@type":"Person","@id":"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca","name":"Yamuna"}]}},"_links":{"self":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts\/66495"}],"collection":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/comments?post=66495"}],"version-history":[{"count":1,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts\/66495\/revisions"}],"predecessor-version":[{"id":66497,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts\/66495\/revisions\/66497"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/media\/66496"}],"wp:attachment":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/media?parent=66495"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/categories?post=66495"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/tags?post=66495"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}