{"id":73212,"date":"2024-02-22T13:32:49","date_gmt":"2024-02-22T08:02:49","guid":{"rendered":"https:\/\/navimumbaihouses.com\/blog\/?p=73212"},"modified":"2024-02-22T13:32:49","modified_gmt":"2024-02-22T08:02:49","slug":"dahisar-to-mira-bhayandar","status":"publish","type":"post","link":"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/","title":{"rendered":"Mumbai Metro Line 9: Route, Map\u00a0&#038; Current Status for Dahisar to Mira Bhayandar"},"content":{"rendered":"<p><a href=\"https:\/\/navimumbaihouses.com\/properties\/search\/mumbai-all\/\">Mumbai<\/a> Metro Line 9 has a completion milestone of around 77 percent, and it is anticipated to begin service by 2025. Line 9 will build an elevated 11.38-kilometer track with eight stations &amp; two interchanges to link <a href=\"https:\/\/navimumbaihouses.com\/properties\/search\/dahisar\/\">Dahisar<\/a> East and <a href=\"https:\/\/navimumbaihouses.com\/properties\/search\/mira-bhayandar%20\/\">Mira Bhayandar<\/a>. This blog offers information about Mumbai Metro Line 9, covering its route, fare, current status, important statistics, and effects on real estate.<\/p>\n<hr \/>\n<p><strong>Are you searching <a href=\"https:\/\/navimumbaihouses.com\/property\/search\/rent\/kamothe\/2BHK\/\">2bhk flat for rent in Kamothe?<\/a><\/strong><\/p>\n<hr \/>\n<p>&nbsp;<\/p>\n<p>Mumbai Metro Line 9 is the expansion of the city&#8217;s Metro Rail Network, extending the currently running Red Line and the soon-to-be-built Line 7A. The proposed line would have connected Dahisar&#8217;s suburbs to Mira Bhayandar, offering commuters an interchange. Mumbai Metro Operation Corporation Ltd. (MMOCL) reports that work on Line 9 is underway with completion anticipated by 2025. This post examines the important information, route map, cost, and effects of Mumbai Metro Line 9 on the city&#8217;s real estate market.<\/p>\n<p>&nbsp;<\/p>\n<h2>Mumbai Metro Line 9: Overview<\/h2>\n<p>The proposed Mumbai Metro Line 9 would connect Dahisar and Mira Bhayandar with rapid transit, greatly impacting the city&#8217;s transportation infrastructure. There are eight stations spread out along the elevated line&#8217;s 11.38 km length. By 2025, the project\u2014which has an estimated budget of Rs 6518 crore\u2014should be finished. Mumbai Metro&#8217;s Line 9 is presently running on the Red Line and is an extension of the soon-to-be Line 7A.<\/p>\n<p>&nbsp;<\/p>\n<h2>Mumbai Metro Line 9: Map &amp; route<\/h2>\n<p>Between Dahisar East and Mira Bhayandar, Mumbai Metro Line 9 will pass through a number of significant locations. It will start at Pandurang Wadi and go through the important neighbourhoods of Sai Baba Nagar, Kashigaon, and Miragaon. Its stations are arranged to improve connection and give Mumbai locals and tourists a dependable mode of transit. The following is a list of Mumbai Metro Line 9 stations and their names:<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"623\"><strong>Stations on Mumbai Metro Line 9<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"623\">Dahisar<\/td>\n<\/tr>\n<tr>\n<td width=\"623\">Pandurang Wadi<\/td>\n<\/tr>\n<tr>\n<td width=\"623\">Miragaon<\/td>\n<\/tr>\n<tr>\n<td width=\"623\">Kashigaon<\/td>\n<\/tr>\n<tr>\n<td width=\"623\">Sai Baba Nagar<\/td>\n<\/tr>\n<tr>\n<td width=\"623\">Meditya Nagar<\/td>\n<\/tr>\n<tr>\n<td width=\"623\">Shaheed Bhaghat Singh Garden<\/td>\n<\/tr>\n<tr>\n<td width=\"623\">Subhash Chandra Bose Ground<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>Mumbai Metro Line 9&#8217;s station and itinerary are shown on this detailed map:<\/p>\n<p>&nbsp;<\/p>\n<h2>Mumbai Metro Line 9: Cost<\/h2>\n<p>The metro will help commuters financially by providing an inexpensive means of transit. The Mumbai Metro&#8217;s Line 9 fares are variable according to distance travelled. The fare information is as follows:<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"312\"><strong>Distance range (Km)<\/strong><\/td>\n<td width=\"312\"><strong>Single journey ticket (Rs)<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"312\">0-3<\/td>\n<td width=\"312\">10<\/td>\n<\/tr>\n<tr>\n<td width=\"312\">12-Mar<\/td>\n<td width=\"312\">20<\/td>\n<\/tr>\n<tr>\n<td width=\"312\">18-Dec<\/td>\n<td width=\"312\">30<\/td>\n<\/tr>\n<tr>\n<td width=\"312\">18-24<\/td>\n<td width=\"312\">40<\/td>\n<\/tr>\n<tr>\n<td width=\"312\">24-30<\/td>\n<td width=\"312\">50<\/td>\n<\/tr>\n<tr>\n<td width=\"312\">30- 36<\/td>\n<td width=\"312\">60<\/td>\n<\/tr>\n<tr>\n<td width=\"312\">36-42<\/td>\n<td width=\"312\">70<\/td>\n<\/tr>\n<tr>\n<td width=\"312\">More than 42<\/td>\n<td width=\"312\">80<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<h2>Current state of Mumbai Metro Line 9<\/h2>\n<h3><span style=\"text-decoration: underline;\">January\u00a02024:<\/span><\/h3>\n<p>The construction of Metro Line 9 is rapidly approaching. It will be an expansion of Mumbai Metro&#8217;s Line 7 and Line 7A. This project is on track to attain its completion milestone of 77 percent and is anticipated to be fully operational by June 2025.<\/p>\n<p>&nbsp;<\/p>\n<h2>Mumbai Metro Line 9: Real estate effects<\/h2>\n<p>The development of Metro Line 9 is expected to improve the local real estate market in the places it will cross. Property values along the metro line&#8217;s path should rise as it gets closer to completion because of the enhanced connectivity. Better transit alternatives will help the eight elevated stations&#8217; neighbours and companies, which will increase the area&#8217;s appeal as a place to live and invest. It&#8217;s possible that real estate developers may express interest in creating projects and infrastructure close to Metro Line 9.<\/p>\n<p>In conclusion, it is reported by Maha Mumbai Metro Operation Corporation Ltd (MMMOCL) that 77 percent of Line 9&#8217;s construction is finished and that service will start in 2025. The Red Line&#8217;s expanded route between Dahisar &amp; Mira Bhayandar is expected to improve accessibility. It is projected that the region will see a spike in real estate development &amp; economic expansion as the completion date draws near.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div id=\"title\" class=\"style-scope ytd-watch-metadata\" style=\"text-align: center;\"><span style=\"text-decoration: underline;\"><strong>2 BHK Furnished Flat for Rent in Kharghar Sector 19 Affordable Luxury Living 8433959100<\/strong><\/span><\/div>\n<p><iframe loading=\"lazy\" title=\"2 BHK Furnished Flat for Rent in Kharghar Sector 19   Affordable Luxury Living   8433959100\" width=\"1024\" height=\"576\" src=\"https:\/\/www.youtube.com\/embed\/ejjCoTu-qI8?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" allowfullscreen><\/iframe><\/p>\n<p style=\"text-align: center;\"><span style=\"text-decoration: underline;\"><strong><a href=\"https:\/\/www.youtube.com\/@NavimumbaiHouses\">Video Source<\/a><\/strong><\/span><\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p>You\u2019re looking for\u00a0<strong>Projects<\/strong>\u00a0in\u00a0<strong>Taloja\u00a0<\/strong>have the Best Properties In\u00a0\u00a0<strong>Navi<\/strong>\u00a0<b>Mumbai\u00a0<\/b>Like\u00a0<strong>Ready to Move:<span style=\"color: #ff0000;\"><a style=\"color: #ff0000;\" href=\"https:\/\/navimumbaihouses.com\/properties\/search\/taloja\/\">https:\/\/navimumbaihouses.com\/properties\/search\/taloja\/<\/a><\/span><\/strong><\/p>\n<p>If\u00a0you want\u00a0<strong>daily property update details<\/strong>\u00a0please follow us on\u00a0<span style=\"color: #ff0000;\"><a style=\"color: #ff0000;\" href=\"https:\/\/www.facebook.com\/navimumbai.houses\/\"><strong>Facebook Page<\/strong><\/a><strong>\u00a0\/\u00a0<\/strong><a style=\"color: #ff0000;\" href=\"https:\/\/www.youtube.com\/channel\/UCJj_M-KlNliMtr_GybNL-Mg?view_as=subscriber\"><strong>YouTube\u00a0Channel<\/strong><\/a><strong>\u00a0\/\u00a0<\/strong><a style=\"color: #ff0000;\" href=\"https:\/\/twitter.com\/NaviMum_Houses\"><strong>Twitter<\/strong><\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mumbai Metro Line 9 has a completion milestone of around 77 percent, and it is anticipated to begin service by 2025. Line 9 will build an elevated 11.38-kilometer track with eight stations &amp; two interchanges to link Dahisar East and Mira Bhayandar. This blog offers information about Mumbai Metro Line 9, covering its route, fare, [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":73214,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[8319,8318],"tags":[22055,22056],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Mumbai Metro Line 9: Route, Map for Dahisar to Mira Bhayandar<\/title>\n<meta name=\"description\" content=\"Mumbai Metro Line 9 has a completion milestone of around 77 percent, and it is anticipated to begin service by 2025.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mumbai Metro Line 9: Route, Map for Dahisar to Mira Bhayandar\" \/>\n<meta property=\"og:description\" content=\"Mumbai Metro Line 9 has a completion milestone of around 77 percent, and it is anticipated to begin service by 2025.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/navimumbai.houses\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-02-22T08:02:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2024\/02\/Mumbai-Metro-Line-9-Dahisar-to-Mira-Bhayandar.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:creator\" content=\"@navimumbaihouse\" \/>\n<meta name=\"twitter:site\" content=\"@navimumbaihouse\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Yamuna\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#website\",\"url\":\"https:\/\/navimumbaihouses.com\/blog\/\",\"name\":\"\",\"description\":\"Real Estate | Property in Navi Mumbai| Buy\/Sale\/Rent Properties Navi Mumbai\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/navimumbaihouses.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2024\/02\/Mumbai-Metro-Line-9-Dahisar-to-Mira-Bhayandar.jpg\",\"contentUrl\":\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2024\/02\/Mumbai-Metro-Line-9-Dahisar-to-Mira-Bhayandar.jpg\",\"width\":1200,\"height\":600,\"caption\":\"Mumbai Metro Line 9: Route, Map & Current Status for Dahisar to Mira Bhayandar\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/#webpage\",\"url\":\"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/\",\"name\":\"Mumbai Metro Line 9: Route, Map for Dahisar to Mira Bhayandar\",\"isPartOf\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/#primaryimage\"},\"datePublished\":\"2024-02-22T08:02:49+00:00\",\"dateModified\":\"2024-02-22T08:02:49+00:00\",\"author\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca\"},\"description\":\"Mumbai Metro Line 9 has a completion milestone of around 77 percent, and it is anticipated to begin service by 2025.\",\"breadcrumb\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/navimumbaihouses.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mumbai Metro Line 9: Route, Map\u00a0&#038; Current Status for Dahisar to Mira Bhayandar\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca\",\"name\":\"Yamuna\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Mumbai Metro Line 9: Route, Map for Dahisar to Mira Bhayandar","description":"Mumbai Metro Line 9 has a completion milestone of around 77 percent, and it is anticipated to begin service by 2025.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/","og_locale":"en_US","og_type":"article","og_title":"Mumbai Metro Line 9: Route, Map for Dahisar to Mira Bhayandar","og_description":"Mumbai Metro Line 9 has a completion milestone of around 77 percent, and it is anticipated to begin service by 2025.","og_url":"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/","article_publisher":"https:\/\/www.facebook.com\/navimumbai.houses\/","article_published_time":"2024-02-22T08:02:49+00:00","og_image":[{"width":1200,"height":600,"url":"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2024\/02\/Mumbai-Metro-Line-9-Dahisar-to-Mira-Bhayandar.jpg","type":"image\/jpeg"}],"twitter_card":"summary","twitter_creator":"@navimumbaihouse","twitter_site":"@navimumbaihouse","twitter_misc":{"Written by":"Yamuna","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/navimumbaihouses.com\/blog\/#website","url":"https:\/\/navimumbaihouses.com\/blog\/","name":"","description":"Real Estate | Property in Navi Mumbai| Buy\/Sale\/Rent Properties Navi Mumbai","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/navimumbaihouses.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/#primaryimage","inLanguage":"en-US","url":"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2024\/02\/Mumbai-Metro-Line-9-Dahisar-to-Mira-Bhayandar.jpg","contentUrl":"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2024\/02\/Mumbai-Metro-Line-9-Dahisar-to-Mira-Bhayandar.jpg","width":1200,"height":600,"caption":"Mumbai Metro Line 9: Route, Map & Current Status for Dahisar to Mira Bhayandar"},{"@type":"WebPage","@id":"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/#webpage","url":"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/","name":"Mumbai Metro Line 9: Route, Map for Dahisar to Mira Bhayandar","isPartOf":{"@id":"https:\/\/navimumbaihouses.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/#primaryimage"},"datePublished":"2024-02-22T08:02:49+00:00","dateModified":"2024-02-22T08:02:49+00:00","author":{"@id":"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca"},"description":"Mumbai Metro Line 9 has a completion milestone of around 77 percent, and it is anticipated to begin service by 2025.","breadcrumb":{"@id":"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/navimumbaihouses.com\/blog\/news\/dahisar-to-mira-bhayandar\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/navimumbaihouses.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Mumbai Metro Line 9: Route, Map\u00a0&#038; Current Status for Dahisar to Mira Bhayandar"}]},{"@type":"Person","@id":"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca","name":"Yamuna"}]}},"_links":{"self":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts\/73212"}],"collection":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/comments?post=73212"}],"version-history":[{"count":1,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts\/73212\/revisions"}],"predecessor-version":[{"id":73215,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts\/73212\/revisions\/73215"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/media\/73214"}],"wp:attachment":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/media?parent=73212"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/categories?post=73212"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/tags?post=73212"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}