{"id":74946,"date":"2024-11-05T10:52:21","date_gmt":"2024-11-05T05:22:21","guid":{"rendered":"https:\/\/navimumbaihouses.com\/blog\/?p=74946"},"modified":"2024-11-05T10:52:21","modified_gmt":"2024-11-05T05:22:21","slug":"mumbai-ahmedabad-bullet-train-2","status":"publish","type":"post","link":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/","title":{"rendered":"Mumbai-Ahmedabad Bullet Train: All River Bridges Completed Between Vapi &#038; Surat"},"content":{"rendered":"<p>The <a href=\"https:\/\/navimumbaihouses.com\/properties\/search\/mumbai-all\/\">Mumbai<\/a>-Ahmedabad High-Speed Rail (MAHSR) project, widely known as the Ahmedabad-Mumbai Bullet Train, has reached an important milestone. All nine river bridges between Vapi &amp; Surat stations have now been completed, representing a significant step forward in the development of this high-speed rail network.<\/p>\n<hr \/>\n<p><strong>Are you searching <\/strong><a href=\"https:\/\/navimumbaihouses.com\/property\/search\/rent\/kharghar\/2BHK\/\"><strong>2bhk flat for rent in kharghar?<\/strong><\/a><\/p>\n<hr \/>\n<p>&nbsp;<\/p>\n<p>This milestone, reported on Sunday, demonstrates the project&#8217;s continuous progress. The most recently finished bridge spans the Kharera River in Gujarat&#8217;s Navsari district. It joins 11 other constructed river bridges in the state, bringing the total to 12 of the 20 planned for the Gujarat section of the bullet train route.<\/p>\n<p>&nbsp;<\/p>\n<h2>Kharera River Bridge Details<\/h2>\n<p>The recently finished Kharera River bridge is a significant structure of 120 metres in length. It is supported by three robust girders, each 40 metres long. The bridge&#8217;s pillars are tall, measuring 14.5 to 19 metres in height. Interestingly, one of the pillars has a unique circular design with a diameter of four metres, which adds a different touch to the bridge&#8217;s attractiveness. The remaining three pillars have conventional diameters of five metres apiece.<\/p>\n<p>The Kharera River Bridge is strategically positioned between the Vapi and Bilimora stations, around 45 kilometres from Vapi and only six kilometres from Bilimora. This new crossing is a critical link in the growing bullet train network. And it is one of numerous bridges built to cross the rivers that run along the route.<\/p>\n<p>&nbsp;<\/p>\n<h2>Beyond Vapi &amp; Surat<\/h2>\n<p>While the new announcement focusses on the Vapi-Surat portion, other elements of the project are still under construction. Three more river crossings have been completed outside of this zone:<\/p>\n<ul>\n<li>Dhadhar River Bridge, Vadodara District<\/li>\n<li>Mohar River Bridge, Kheda District<\/li>\n<li>Vatrak River Bridge (Kheda District).<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h2>A Bridge to the Future.<\/h2>\n<p>The completion of these river bridges represents further progress on the ambitious Mumbai-Ahmedabad Bullet Train Project. This 508-kilometre route intends to transform high-speed rail travel in India by linking the country&#8217;s two largest economic regions, Mumbai and Ahmedabad.<\/p>\n<p>Once operational, bullet trains will run at speeds greater than 320 kilometres per hour. Dramatically cutting travel time between the two cities. A traditional train travel currently takes about six hours, but with the advent of bullet trains, that time will be reduced to just two hours.<\/p>\n<p>This project, carried out in conjunction with Japan, marks a significant step forward in India&#8217;s infrastructure development. It is projected to improve regional connections, boost economic growth, and create new job opportunities, notably in Gujarat &amp; Maharashtra.<\/p>\n<p>The MAHSR project is envisioned to be a game changer, ushering in a new era of safe, efficient, &amp; high-speed rail transport for Indian citizens. It also establishes Indian Railways as a major player on the global scene in terms of reach, speed, &amp; technological sophistication.<\/p>\n<p>The Mumbai-Ahmedabad High-Speed Rail route runs across the rapidly developing states of Gujarat &amp; Maharashtra, connecting major commercial areas such as Mumbai, Surat, Vadodara, and Ahmedabad. The sanctioned cost for this ambitious project is Rs 1,08,000 crore.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div id=\"title\" class=\"style-scope ytd-watch-metadata\" style=\"text-align: center;\"><span style=\"text-decoration: underline;\"><strong><span class=\"style-scope yt-formatted-string\" dir=\"auto\">Luxurious 2BHK Flat For Sale In Kharghar\u00a0<\/span><a class=\"yt-simple-endpoint style-scope yt-formatted-string\" dir=\"auto\" spellcheck=\"false\" href=\"https:\/\/www.youtube.com\/hashtag\/houseforsale\">#houseforsale<\/a><span class=\"style-scope yt-formatted-string\" dir=\"auto\">\u00a0<\/span><a class=\"yt-simple-endpoint style-scope yt-formatted-string\" dir=\"auto\" spellcheck=\"false\" href=\"https:\/\/www.youtube.com\/hashtag\/propertyinvestment\">#propertyinvestment<\/a><span class=\"style-scope yt-formatted-string\" dir=\"auto\"> | 8433959100<\/span><\/strong><\/span><\/div>\n<p><iframe loading=\"lazy\" title=\"Luxurious 2BHK Flat For Sale In Kharghar #houseforsale #propertyinvestment | 8433959100\" width=\"1024\" height=\"576\" src=\"https:\/\/www.youtube.com\/embed\/jQ34_jguMro?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n<p style=\"text-align: center;\"><span style=\"text-decoration: underline;\"><strong><a href=\"https:\/\/www.youtube.com\/@NavimumbaiHouses\">Video Source<\/a><\/strong><\/span><\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p>You\u2019re looking for\u00a0<strong>Projects<\/strong>\u00a0in <b>Vikhroli <\/b>have the Best Properties In\u00a0<strong>Mumbai<\/strong>\u00a0Like\u00a0<strong>Ready to Move:<span style=\"color: #ff0000;\"><a style=\"color: #ff0000;\" href=\"https:\/\/navimumbaihouses.com\/properties\/search\/vikhroli\/\">https:\/\/navimumbaihouses.com\/properties\/search\/vikhroli\/<\/a><\/span><\/strong><\/p>\n<p>If\u00a0you want\u00a0<strong>daily property update details<\/strong>\u00a0please follow us on\u00a0<span style=\"color: #ff0000;\"><a style=\"color: #ff0000;\" href=\"https:\/\/www.facebook.com\/navimumbai.houses\/\"><strong>Facebook Page<\/strong><\/a><strong>\u00a0\/\u00a0<\/strong><a style=\"color: #ff0000;\" href=\"https:\/\/www.youtube.com\/channel\/UCJj_M-KlNliMtr_GybNL-Mg?view_as=subscriber\"><strong>YouTube\u00a0Channel<\/strong><\/a><strong>\u00a0\/\u00a0<\/strong><a style=\"color: #ff0000;\" href=\"https:\/\/twitter.com\/NaviMum_Houses\"><strong>Twitter<\/strong><\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, widely known as the Ahmedabad-Mumbai Bullet Train, has reached an important milestone. All nine river bridges between Vapi &amp; Surat stations have now been completed, representing a significant step forward in the development of this high-speed rail network. Are you searching 2bhk flat for rent in kharghar? &nbsp; This [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":74947,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[8318],"tags":[22442],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Mumbai-Ahmedabad Bullet Train: Bridges Completed Between Vapi&amp;Surat<\/title>\n<meta name=\"description\" content=\"Mumbai-Ahmedabad Bullet Train- The Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, widely known as the Ahmedabad-Mumbai Bullet Train,\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mumbai-Ahmedabad Bullet Train: Bridges Completed Between Vapi&amp;Surat\" \/>\n<meta property=\"og:description\" content=\"Mumbai-Ahmedabad Bullet Train- The Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, widely known as the Ahmedabad-Mumbai Bullet Train,\" \/>\n<meta property=\"og:url\" content=\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/navimumbai.houses\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-05T05:22:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2024\/11\/Mumbai-Ahmedabad-Bullet-Train-All-River-Bridges-Completed-Between-Vapi-Surat.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:creator\" content=\"@navimumbaihouse\" \/>\n<meta name=\"twitter:site\" content=\"@navimumbaihouse\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Yamuna\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#website\",\"url\":\"https:\/\/navimumbaihouses.com\/blog\/\",\"name\":\"\",\"description\":\"Real Estate | Property in Navi Mumbai| Buy\/Sale\/Rent Properties Navi Mumbai\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/navimumbaihouses.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2024\/11\/Mumbai-Ahmedabad-Bullet-Train-All-River-Bridges-Completed-Between-Vapi-Surat.jpg\",\"contentUrl\":\"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2024\/11\/Mumbai-Ahmedabad-Bullet-Train-All-River-Bridges-Completed-Between-Vapi-Surat.jpg\",\"width\":1200,\"height\":600,\"caption\":\"Mumbai-Ahmedabad Bullet Train: All River Bridges Completed Between Vapi & Surat\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/#webpage\",\"url\":\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/\",\"name\":\"Mumbai-Ahmedabad Bullet Train: Bridges Completed Between Vapi&Surat\",\"isPartOf\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/#primaryimage\"},\"datePublished\":\"2024-11-05T05:22:21+00:00\",\"dateModified\":\"2024-11-05T05:22:21+00:00\",\"author\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca\"},\"description\":\"Mumbai-Ahmedabad Bullet Train- The Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, widely known as the Ahmedabad-Mumbai Bullet Train,\",\"breadcrumb\":{\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/navimumbaihouses.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mumbai-Ahmedabad Bullet Train: All River Bridges Completed Between Vapi &#038; Surat\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca\",\"name\":\"Yamuna\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Mumbai-Ahmedabad Bullet Train: Bridges Completed Between Vapi&Surat","description":"Mumbai-Ahmedabad Bullet Train- The Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, widely known as the Ahmedabad-Mumbai Bullet Train,","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/","og_locale":"en_US","og_type":"article","og_title":"Mumbai-Ahmedabad Bullet Train: Bridges Completed Between Vapi&Surat","og_description":"Mumbai-Ahmedabad Bullet Train- The Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, widely known as the Ahmedabad-Mumbai Bullet Train,","og_url":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/","article_publisher":"https:\/\/www.facebook.com\/navimumbai.houses\/","article_published_time":"2024-11-05T05:22:21+00:00","og_image":[{"width":1200,"height":600,"url":"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2024\/11\/Mumbai-Ahmedabad-Bullet-Train-All-River-Bridges-Completed-Between-Vapi-Surat.jpg","type":"image\/jpeg"}],"twitter_card":"summary","twitter_creator":"@navimumbaihouse","twitter_site":"@navimumbaihouse","twitter_misc":{"Written by":"Yamuna","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/navimumbaihouses.com\/blog\/#website","url":"https:\/\/navimumbaihouses.com\/blog\/","name":"","description":"Real Estate | Property in Navi Mumbai| Buy\/Sale\/Rent Properties Navi Mumbai","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/navimumbaihouses.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/#primaryimage","inLanguage":"en-US","url":"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2024\/11\/Mumbai-Ahmedabad-Bullet-Train-All-River-Bridges-Completed-Between-Vapi-Surat.jpg","contentUrl":"https:\/\/navimumbaihouses.com\/blog\/wp-content\/uploads\/2024\/11\/Mumbai-Ahmedabad-Bullet-Train-All-River-Bridges-Completed-Between-Vapi-Surat.jpg","width":1200,"height":600,"caption":"Mumbai-Ahmedabad Bullet Train: All River Bridges Completed Between Vapi & Surat"},{"@type":"WebPage","@id":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/#webpage","url":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/","name":"Mumbai-Ahmedabad Bullet Train: Bridges Completed Between Vapi&Surat","isPartOf":{"@id":"https:\/\/navimumbaihouses.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/#primaryimage"},"datePublished":"2024-11-05T05:22:21+00:00","dateModified":"2024-11-05T05:22:21+00:00","author":{"@id":"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca"},"description":"Mumbai-Ahmedabad Bullet Train- The Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, widely known as the Ahmedabad-Mumbai Bullet Train,","breadcrumb":{"@id":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/navimumbaihouses.com\/blog\/news\/mumbai-ahmedabad-bullet-train-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/navimumbaihouses.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Mumbai-Ahmedabad Bullet Train: All River Bridges Completed Between Vapi &#038; Surat"}]},{"@type":"Person","@id":"https:\/\/navimumbaihouses.com\/blog\/#\/schema\/person\/c007184f629e4eafc1a6fffbc67efeca","name":"Yamuna"}]}},"_links":{"self":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts\/74946"}],"collection":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/comments?post=74946"}],"version-history":[{"count":1,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts\/74946\/revisions"}],"predecessor-version":[{"id":74948,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/posts\/74946\/revisions\/74948"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/media\/74947"}],"wp:attachment":[{"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/media?parent=74946"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/categories?post=74946"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/navimumbaihouses.com\/blog\/wp-json\/wp\/v2\/tags?post=74946"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}